Skip to content
Grainelle
Language: ENEnglish
Request a quote
Grainelle wood wall panel sourcing deskCARB P2 · TSCA Title VI · FSC CoC · ASTM E84 · NRC testedA FULVERA sourcing brand
  1. Home
  2. Programs
  3. Projects

Panels for hotels and office projects

A project buyer purchases three things at once: panels, papers and dates. Fire documentation that survives the consultant, color that matches from floor one to floor twelve, and deliveries that land when the site is ready - the desk programs all three.

Request a quote

Hotel corridor with acoustic slat panels and veneer walls in warm oak tones
Illustration

What a project buyer is actually purchasing

A hotel renovation or an office fit-out buys the panel three times over. The designer buys the look: a corridor that photographs warm, a meeting floor that reads calm. The consultant buys the file: fire classes, emission grades, acoustic values, each traceable to a report for the specific model installed. The project manager buys the calendar: materials on site between drywall and joinery, in quantities phased by floor, with nothing arriving early to sit under a leaky roof or late to stall a critical path. A panel program that serves only the designer creates the classic project failure - a beautiful product the consultant rejects or the schedule cannot absorb.

The desk writes all three into one program sheet: the specification, the document route and the delivery phasing, confirmed in writing before production. Partner plants manufacture; the desk coordinates, verifies and phases.

Fire documentation done properly

Fire is the document projects argue about, so the discipline is strict: a fire class is a property of a tested assembly, quoted from the test report for the specific model. In North America that is typically an ASTM E84 surface burning class; in Europe an EN 13501-1 rating such as B-s1,d0; the wording always carries the report reference. What a project never does is generalize - a Class A result on one profile does not describe its untested cousin. The desk collects the reports from partner plants, verifies them against the models on the schedule, and indexes them into the submittal so the consultant reviews documents that match the order. The fire rating guide explains the class systems, and the honest boundaries - no panel is described as fireproof, anywhere on this site - are part of the service.

DocumentWhat it statesWhen it is issued
Fire test reportClass for the tested model and assemblyCollected at submittal; referenced on every batch delivery
Emission certificateTSCA Title VI / CARB P2 or E0-E1 class per lotPer lot, matched to shipment documents
Acoustic reportNRC for the tested configurationAt submittal for rated areas; per configuration change
Custody documentsFSC or PEFC chain of custody per lot where claimedPer lot, before delivery is released
Inspection recordLot checks against the retained swatch and planWith each shipment, in pass-through format

Batch color discipline across floors and phases

Project color risk is arithmetic: twelve floors of corridor ordered in three phases will meet each other in the same elevator lobby. The controls are the same ones brands use, applied at project scale - one retained swatch signed at approval, every lot checked under a standard lamp before shipment, and colors windowed so all material for one visible zone comes from one production run wherever the schedule allows. Where phasing makes single-run color impossible, adjacent lots are deliberately sequenced so a boundary falls in a doorway or a reveal, not mid-wall. The color matching note describes the mechanics, and the retained swatch stays in the desk's file for the life of the building program, not just the first order.

Acoustics in corridors, rooms and meeting floors

Hotels and offices absorb sound twice: once in the guest experience and once in the meeting that has to end on time. Slat panels with PET felt backing are the workhorse - tested configurations of the slat family commonly report NRC in the 0.75-0.85 band, with the rating belonging to the tested configuration, not the family name. The desk supplies the report behind the number and flags where a design detail - glass, doors, ceiling void - will change the real-world result more than the panel choice will. The acoustic slat panel line carries the rated formats, and the hotel package guide breaks down rooms, corridors and lobbies as separate specifications.

Schedules, phasing and site reality

Project timing is won in the plan, not the promise. Reference production runs 25-45 days per batch, and custom colors 45-60 on a first run; the program sheet fixes dates per phase and the desk sequences plants so a slipped batch moves a buffer zone, not a critical path. Deliveries phase by floor with crates labeled to room ranges, because site storage is scarce and double-handling is where panels get damaged. Solid stock enters where wear demands it - the solid wood line for feature areas that take trolley and luggage impact - while veneer-faced formats carry the broad wall areas at the schedule's pace. Reference quantities and timing sit on the MOQ and lead time page, converted to milestone dates per order.

An illustrative corridor program

Illustrative, and anonymous: a regional hotel group renovating corridor walls and elevator lobbies across a trading year. Phase one specified a walnut acoustic slat format for corridors with a matching veneer reveal at doors; the submittal carried the model's fire report and the felt configuration's acoustic test; three floors' worth of material came from one production window, with the retained swatch signed by the designer's representative. Phases two and three reordered against the same swatch six months apart, and the lots passed the lamp check without rework. The pattern - documents first, one window per visible zone, swatch held for the program's life - repeats across projects more than any particular specification does. More worked examples sit on the case studies page.

How a project starts

  1. Specification review: lines, colors, rated areas and phasing from the drawings.
  2. Plants shortlisted per line; submittal documents collected and verified.
  3. Program sheet confirmed in writing: grades, swatch, windows, milestones.
  4. Phased production with per-lot checks; crates labeled to room ranges.
  5. Closeout file assembled: reports, certificates, inspection records, per project.

When drawings and schedules are ready, the quote form turns them into line recommendations, document routes and a phased window plan for the consultant and the site to approve.

Questions buyers ask

Do you provide fire certificates for projects?

The partner plants hold the test reports; the desk collects and verifies them per project and indexes them into the submittal, so the consultant reviews classes that match the exact models ordered, quoted per report.

How is color kept identical across floors?

One retained swatch signed at approval, a lamp check of every lot before shipment, and production windowed so visible zones draw from one run where the schedule allows. Phase boundaries are planned into doorways and reveals.

What acoustic value can we list?

For tested slat configurations with PET felt backing, reports commonly show NRC in the 0.75-0.85 band. The number belongs to the tested configuration, so listings and submittals quote the report, never the family name.

How are deliveries phased on site?

By floor, with crates labeled to room ranges and milestone dates confirmed in writing per order. Buffer zones absorb any slipped batch so the critical path keeps moving.

Can you match a hotel group standard across properties?

Yes, through the retained swatch system: the group's standard is signed and held in the program file, and every property's lots are checked against it for the life of the program, not just the first order.

Send the lines and colors you need, target sizes and grades, the area per color and your market. The desk replies in writing with matched plants, a swatch program, certification routes and the reference MOQ.

Request a quote